#71503: "A lot more automation in production phase through pre-planning"
Apie ką šis pranešimas?
Kas nutiko? Pasirinkite iš žemiau esančio sąrašo
Kas nutiko? Pasirinkite iš žemiau esančio sąrašo
Patikrinkite, ar jau yra pranešimas apie tą patį dalyką
Jei taip, balsuokite už šią ataskaitą. Ataskaitos su dauguma balsų pateikiamos PRIORITETU!
| # | Status | Votes | Game | Type | Title | Last update |
|---|
Detalus apibūdinimas
-
• Jei ekrane matote kokį nors klaidos pranešimą, įklijuokite jį čia.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Prašome paaiškinti, ką norėjote padaryti, ką padarėte ir kas atsitiko
• Kokia tavo naršyklė?
Google Chrome v102
-
• Prašome nukopijuoti / įklijuoti tekstą, rodomą anglų kalba, o ne savo kalba. If you have a screenshot of this bug (good practice), you can use a picture hosting service of your choice (snipboard.io for example) to upload it and copy/paste the link here. Ar šis tekstas yra translation system? Jei taip, ar jis buvo išverstas daugiau nei 24 valandas?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Kokia tavo naršyklė?
Google Chrome v102
-
• Prašome paaiškinti siūlomą pakeitimą tiksliai ir glaustai, kad būtų kuo lengviau suprasti, ką jūs siūlote.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Kokia tavo naršyklė?
Google Chrome v102
-
• Kas buvo pavaizduota ekrane, tave užblokavus (juodas ekranas? Nepilna žaidimo sąsaja? Klaidos pranešimas?)
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Kokia tavo naršyklė?
Google Chrome v102
-
• Į kurias taisykles neatsižvelgiama BGA žaidimo versijoje
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Ar taisyklių pažeidimas matomas žaidimo atkartojime? Jeigu taip, kuris veiksmo numeris?
• Kokia tavo naršyklė?
Google Chrome v102
-
• Kurį žaidimo veiksmą norėjai atlikti?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Ką reikia padaryti, kad iššauktum šį žaidimo veiksmą?
-
• Kas įvyko kai bandei tai padaryti (klaidos pranešimas, žaidimo būsenos pranešimas, ...)?
• Kokia tavo naršyklė?
Google Chrome v102
-
• Kuriuo žaidimo metu problema atsirado (koks buvo tuometinis žaidimo nurodymas)?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
-
• Kas įvyko kai bandei atlikti žaidimo veiksmą (klaidos pranešimas, žaidimo būsenos pranešimas, ...)?
• Kokia tavo naršyklė?
Google Chrome v102
-
• Aprašykite rodomą problemą. If you have a screenshot of this bug (good practice), you can use a picture hosting service of your choice (snipboard.io for example) to upload it and copy/paste the link here.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Kokia tavo naršyklė?
Google Chrome v102
-
• Prašome nukopijuoti / įklijuoti tekstą, rodomą anglų kalba, o ne savo kalba. If you have a screenshot of this bug (good practice), you can use a picture hosting service of your choice (snipboard.io for example) to upload it and copy/paste the link here. Ar šis tekstas yra translation system? Jei taip, ar jis buvo išverstas daugiau nei 24 valandas?
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Kokia tavo naršyklė?
Google Chrome v102
-
• Prašome paaiškinti siūlomą pakeitimą tiksliai ir glaustai, kad būtų kuo lengviau suprasti, ką jūs siūlote.
This is a great game but it has lots of tiny decisions which makes it not very good in turn-based mode.
However, all those decisions in the production phase could be made before hand.
And, in our heads, they usually are made well ahead.
So I would like to be able to order the cards in my construction area (by dragging them around).
There would also be a zone in the construction area for cards "in the freezer".
And a preference to allow auto-allocation:
* During production, cubes produced would be automatically added to cards that require from left to right. Cards in the "freezer" zone would be ignored.
* one of the choices for the preference would also auto-spend managers and joker cubes when they are required and it is possible to finish the construction.
* 3rd choice for the preference would be as above except that joker cubes would also be used for non-joker resources.
* and, of course, a 4th choice would just forbid automation.
If any cubes are left after this, the game would ask for my input or not depending on what cubes remain and what the "skip production" option is set at.
If it does ask for my input, I think, I should be able to cancel my complete turn including the part that was automated.
I know, it's complex but it would make things so much quicker in turn based mode.
• Kokia tavo naršyklė?
Google Chrome v102
Raportų istorija
This could be auto-placement of produced cube if there is only one card that needs it.
Or we could set *one* card to auto-build in priority and cubes would automatically go to it.
Papildyti šį raportą
- Kitas stalo ID / ėjimo ID
- Ar F5 išsprendė šią problemą?
- Ar problemos atsirado keletą kartų? Kiekvieną kartą? Atsitiktiniu metu?
- If you have a screenshot of this bug (good practice), you can use a picture hosting service of your choice (snipboard.io for example) to upload it and copy/paste the link here.